No, we're not hanging our hardhats (or
any hats) there yet, though when this project started we thought we'd be about to move in by now. Such is new construction.
And such is trying to keep up with blogging about it ~ I can't believe my last house update post was three weeks ago today! But it doesn't mean I haven't been documenting the progress. Progress that hasn't been without glitches, such as window and door trim preventing vanity drawers in two bathrooms from opening fully, traffic flow issues requiring a post-installation kitchen island redesign, and a broken pump on the Sherwin Williams' tinting machine (it really does matter how much raw umber
ends up in your paint samples!) The vanity drawers vs. trim battle is the latest one being waged, and though it's frustrating, we're optimistic it will be won. Again, such is new construction!
So, picking up where I left off on July 1, here's photographic evidence of some of the progress to date...
When we ride our bikes to the job site, we take this route through a quiet neighborhood and down the walking/biking path behind the house. That way we can sneak up on our contractors. ;-) It also affords us this fun view...
The back of our future house (in the middle),
taken from the not-yet-paved neighboring walking trail.
On this holiday visit to the house, we were pleasantly surprised to see that most of the interior doors were hung! Here BW celebrates (with the door to our master bedroom behind him) by hoisting our master bathroom tile sample in lieu of a frosty mug of beer. Unfortunately, the celebration was premature since by our next visit to the house, all the doors had been removed and have been leaning against the walls ever since (we know not why). Oh well, it was fun while it lasted!
The laundry room (over BW's right shoulder) now has a tiled floor,
but the master bath tile sample remains just that - a sample.
That floor will be done when the shower tiling is complete.
If this guy had a pair of shorts and a face,
and were holding a tile and sunglasses,
he'd look a little like BW! Only not as tan.
:-)
The next week was an exciting one, as Todd's Uncle Kirk came down from Montana to start our tile work. (He's my favorite of all the guys who have been working on the house). Here is the kitchen floor in progress...
And here it is, completed and grouted, and now with kitchen cabinets placed on it willy-nilly as they await installation...
Both upper cabinets in the corner will have glass doors
Sometimes it feels like things take forever to get done, but sometimes we'll go out in the morning to find a scene like the willy-nilly cabinets, only to return after lunch to find something like this...
The island re-design I mentioned has yet to be implemented,
but involves eliminating the raised breakfast bar on the right.
It would stick out too far and impede traffic flow from the garage.
The raised bar in front (facing the great room) will stay.
You can't always know things when they're ideas on paper,
you have to see them come together in reality first!
Then you cuss and find a fix, which is often a better idea anyway!
After Kirk finished the tile floors in the kitchen and front entry, he moved his operation upstairs...
The guest bathroom floor, which has since been finished
and isn't nearly as gold-colored as it appears in this photo
...while the hardwood floor guys got started in the living room...
It takes a lot of equipment to install wood floors! (they're finishing up the dining room in this photo, and have now finished that, the hallway, the half bath and the study. They plan to sand tomorrow and start staining on Tuesday)...
Note the masked windows ~ the painters got in on the action too,
though so far it's all been prep work.
Exterior painting is scheduled to start this week.
Here's Uncle Kirk prepping the master bath shower stall for tile...
It's halfway done, but I'll wait and show it to you finished.
Poor Kirk has had to work upstairs in 100ยบ outside temps.
There's no a/c nor blown-in insulation in the attic yet,
and he can't use fans while he works
because they'd dry the thin-set and grout too quickly.
I'd be wicked cranky, but he always stays cheerful!
And here's the most recent photo, taken just yesterday morning when we went over to slap our paint samples (now with adequate amounts of raw umber in them) on the walls. The maintenance-free shakes were just installed in the gables Friday afternoon, and the big red dumpster was moved so they could prep and frame the driveway for concrete (being poured Monday). So I finally had an uncluttered view of the front of the house and took advantage of it!...

In addition to the Challenge of the Vanities (let's
hope it doesn't turn into a
Bonfire, lol), there's a more complicated problem we just discovered that needs to be fixed - we're just hoping it doesn't cause significant delays. (I'll write about it as the details of the solution and its repercussions are made clear). Meanwhile, the hardwood floors and master bath shower are being completed, the driveway's being poured and the exterior painting is getting underway this week, our kitchen appliances are being delivered Thursday. And before the month is out we're also looking forward to seeing countertops and plumbing fixtures installed, the stone mason's arrival to finish the garage and front porch, interior priming and painting, and
everyone is rooting for the HVAC guys to return and install the air conditioner! So stay tuned for more updates! :-)